09 · Quality Engineering & Testing
Release often without breaking what works.
When teams call us
You might be here because…
- 01Every release breaks something that used to work.
- 02Manual regression testing takes days, so releases wait.
- 03The app slows down or falls over when usage peaks.
- 04Customers, procurement teams or the law expect accessibility, such as WCAG 2.2 or the European Accessibility Act.
- 05You have tests, but nobody trusts them because they fail at random.
01What we build
Quality Engineering & Testing, in practice.
01
Test strategy
What to test, at which level and how deeply, decided by risk: a written plan that fits how often you release, not a coverage number.
02
Test automation
Unit, integration and end-to-end suites with Playwright, Cypress, Vitest or the tools you already use, running in your pipeline on every change, with flaky tests fixed rather than ignored.
03
API and contract testing
Tests that pin down the behavior of your APIs and the contracts between services, so one team’s change can’t silently break another’s.
04
Performance and load testing
Realistic load run with k6 against response-time and error budgets, to find the bottleneck before your users do.
05
Accessibility testing
Automated checks plus manual keyboard and screen-reader testing against WCAG 2.2 AA, with fixes your designers and engineers can apply.
06
Mobile and cross-browser testing
The devices and browsers your users actually have: layouts, gestures, offline states and the versions you still support.
02How we hold the line
The standards that come with it.
- Risk decides depth
- Critical paths get the most testing. Fewer tests that catch real failures beat a high coverage figure.
- Tests you can trust
- A flaky test is treated as a bug. Suites are fast enough to run on every change and clear about why they failed.
- Built in, not inspected in
- Testing runs alongside development, in the same pipeline and the same definition of done.
- Standards we test against
- WCAG 2.2 for accessibility, service-level objectives for performance and ISTQB terminology for test planning. We say “aligned with”, never “certified by”.
03Across the loop
How this practice shows up at every stage.
01 · 000°
Design
Acceptance criteria and testability decided with the design.
02 · 060°
Engineer
Tests written alongside the code, in the same change.
03 · 120°
Integrate
Contract tests at every API and integration boundary.
04 · 180°
Secure
Security checks in the same pipeline as the functional tests.
05 · 240°
Scale
Load tests against the traffic you expect, before it arrives.
06 · 300°
Maintain
Regression suites kept fast and green as the product changes.
04Tools we reach for
Chosen for your constraints, not our habits. These are common starting points, not a catalogue.
- Automation
- PlaywrightCypressVitestJestAppium
- Performance and accessibility
- k6Lighthouseaxe-core
05How engagements run
How engagements run
Quality assessment
A short review of your tests, pipeline and release process, with a prioritized plan.
Automation build-out
We build the suites and the pipeline, then hand them over with the know-how to keep them green.
Testing as a service
Ongoing testing for every release: regression, new features and devices, by a team that knows your product.
See how an engagement runs, from the first call to handover.
Questions
What people ask first.
No. We test existing products too, alongside your developers or another vendor. On our own builds, testing is part of delivery rather than a separate line item.
Both, for different jobs. Automation covers what must never break and runs on every change. People cover what automation is bad at: exploratory testing, usability, accessibility with assistive technology and features still taking shape.
Yes. We extend the frameworks and pipeline you already have unless they are the problem, and if we suggest a change we explain the cost and the benefit first.
Start a conversation
What are you building?
A few lines are enough. We reply in writing, with questions rather than a sales deck.


